All references

Medium-voltage manufacturing site with rooftop solar

Several production halls, 728 kWp rooftop solar and seven battery systems totalling 1.8 MWh. DT1Next manages demand peaks, power factor and dispatch commands.

3D drone model. Drag with the mouse to rotate, zoom with the buttons or Ctrl + scroll.3D drone model. Tap Rotate model, then turn with one finger and zoom with two fingers or the buttons.

About the installation

A large manufacturing site connected to medium voltage. Solar is spread over the roofs of several halls, battery storage stands near the loads. Because solar and batteries cover much of the active demand, the power factor worsened; DT1Next therefore also controls inverter reactive power, keeps a battery reserve for quarter-hour peaks and follows dispatch commands.

Key figures

Solar
728 kWp
Battery
1,781 kWh (7 battery systems)
Connection
medium voltage
Region
Hradec Králové Region
What DT1Next controls
Self consumption, Peak shaving, Power factor, Grid dispatch

Photos

Aerial view of the site: Medium-voltage manufacturing site with rooftop solar (1)Aerial view of the site: Medium-voltage manufacturing site with rooftop solar (2)