All references

Plastics manufacturing: solar and containerised battery

99 kWp rooftop solar and a 472 kWh containerised battery in the middle of the site, sized mainly for peaks and prices.

3D drone model. Drag with the mouse to rotate, zoom with the buttons or Ctrl + scroll.3D drone model. Tap Rotate model, then turn with one finger and zoom with two fingers or the buttons.

About the installation

A plastics processing plant with continuous demand. Rooftop solar covers part of the daytime load, but the containerised battery does the heavy lifting: DT1Next uses it to shave quarter-hour peaks, charge in cheap hours and cover expensive periods.

Key figures

Solar
99.45 kWp
Battery
472.15 kWh
Connection
low voltage
Region
Hradec Králové Region
What DT1Next controls
Self consumption, Peak shaving, Spot arbitrage

Photos

Aerial view of the site: Plastics manufacturing: solar and containerised battery (1)Aerial view of the site: Plastics manufacturing: solar and containerised battery (2)