All references

Medium-voltage engineering plant: two solar plants and two batteries

Two solar plants totalling 289 kWp and two batteries with 582 kWh. The older plant runs under a green bonus scheme; DT1Next controls everything as one system.

3D drone model. Drag with the mouse to rotate, zoom with the buttons or Ctrl + scroll.3D drone model. Tap Rotate model, then turn with one finger and zoom with two fingers or the buttons.

About the installation

A manufacturer of machinery for the stone industry, connected to medium voltage. The site has two solar plants: an older 123 kWp plant under a green bonus scheme and a newer 166 kWp plant. The original 60 kWh battery in the hall was joined by a 522 kWh, 250 kW storage system. DT1Next runs both plants and both batteries as one system: it keeps the reserved capacity in every quarter hour, controls the power factor, follows grid operator dispatch and shifts cheap energy to expensive hours.

Key figures

Solar
288.88 kWp
Battery
582.48 kWh (60 kWh + 522 kWh)
Connection
medium voltage
Region
Vysočina Region
What DT1Next controls
Self consumption, Peak shaving, Spot arbitrage, Power factor, Grid dispatch

Photos

Aerial view of the site: Medium-voltage engineering plant: two solar plants and two batteries (1)Aerial view of the site: Medium-voltage engineering plant: two solar plants and two batteries (2)